Fairhaven/Lincoln and Santa Clara/Lincoln Intersection Modifications, Supplement to the Santa Ana Second Main Track EIR

9 Documents in Project

Summary

SCH Number
2000091065
Lead Agency
Southern California Regional Rail Authority
Document Title
Fairhaven/Lincoln and Santa Clara/Lincoln Intersection Modifications, Supplement to the Santa Ana Second Main Track EIR
Document Type
NOD - Notice of Determination
Received
Posted
7/8/2009
Present Land Use
Railroad Corridor
Document Description
Two-way travel at Lincoln Avenue and Fairhaven Avenue is currently blocked with concrete barriers. Revisions to the original 2002 project would close the Lincoln Avenue vehicle lanes from Fairhaven Avenue to Park Lane. Reconfigure Fairhaven Avenue to terminate a cul-de-sac east of the railroad tracks. The cul-de-sac would include driveways to permit access for rail maintenance vehicles. Two-way traffic would be maintained on Lincoln Avenue from Park Lane to Santa Clara Avenue. Additionally, to improve safety at the Santa Clara Avenue and Lincoln Avenue intersection a traffic signal would be installed and intersection modifications would occur. A new railroad crossing pre-signal and signage would be installed for westbound traffic on Santa Clara Avenue east of the track to prevent traffic queuing onto or near the tracks and to prevent vehicles from being trapped between the railroad crossing gates. Westbound traffic on Santa Clara Avenue would stop before crossing the tracks.

Contact Information

Name
David Biondolillo
Agency Name
City of Santa Ana
Contact Types
Lead/Public Agency

Location

Cities
Orange, Santa Ana
Counties
Orange
Cross Streets
Between La Veta Avenue (north) and 17th Street (south)
Total Acres
10.9
State Highways
I-5 and SR-22
Railways
SCRRA/BNSF
Waterways
Santiago Creek and Santa Ana River
Township
4&5S
Range
9W
Base
SB

Notice of Determination

Approving Agency
City of Santa Ana
Approving Agency Role
Lead Agency
Approved On

Determinations

(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
Yes
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
No
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
No
(4) A mitigation reporting or monitoring plan was adopted for this project
N/A
(5) A Statement of Overriding Considerations was adopted for this project
No
(6) Findings were made pursuant to the provisions of CEQA
No

Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above. You may also contact the OPR via email at state.clearinghouse@opr.ca.gov or via phone at (916) 445-0613.