Pala Mesa Highlands Major Subdivision

5 Documents in Project

Summary

SCH Number
2000091034
Lead Agency
San Diego County
Document Title
Pala Mesa Highlands Major Subdivision
Document Type
NOD - Notice of Determination
Received
Posted
6/25/2007
Present Land Use
The site is located within the Pala Mesa Private Development Plan prepared in 1973, and revised in 1974. The site is within the Current Urban Development Area and is designated (21) Specific Plan Area under the County of San Diego General Plan, the Fallbrook Community Plan, and the County Zoning Ordinance. Under the PDP, the area is designated for attached homes. However, currently the site is vacant land, which has been used historically for citrus groves.
Document Description
The project includes a tentative map, rezone, and minor amendment to the 1973 Pala Mesa Private Development Plan for the subdivision of the 85.9-acre parcel into 124 residential lots. The project includes two parks and a 36.9-acre permanent open space area. Lots would range in size from 6,000 square feet two 25,000 square feet.

Contact Information

Name
Maggie Loy
Agency Name
San Diego County, Department of Planning and Land Use
Contact Types
Lead/Public Agency

Location

Cities
San Diego
Counties
San Diego
Cross Streets
Old Highway 395 at Pala Mesa Drive
Total Acres
86
Parcel #
125-050-53, 59
State Highways
395, I-15
Waterways
San Luis Rey River
Base
SBM
Other Location Info
City/Community: Pala Mesa
Other Information
33° 20' 16.5" N, 117° 9' 48.7" W

Notice of Determination

Approving Agency
County of San Diego Board of Supervisors
Approving Agency Role
Lead Agency
Approved On

Determinations

(1) The project will have a significant impact on the environment
Yes
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
Yes
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
No
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
N/A
(5) A Statement of Overriding Considerations was adopted for this project
No
(6) Findings were made pursuant to the provisions of CEQA
Yes

Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above. You may also contact the OPR via email at state.clearinghouse@opr.ca.gov or via phone at (916) 445-0613.