Irvine Ranch Water District-San Joaquin Reservoir Project

Summary

SCH Number
2000091031
Lead Agency
Irvine Ranch Water District
Document Title
Irvine Ranch Water District-San Joaquin Reservoir Project
Document Type
NEG - Negative Declaration
Received
Present Land Use
Reservoir/ Circulation Element Roadway/ Open space preservation
Document Description
IRWD, as the largest percentage owner (48%), proposes to buy the capacity allocation and ownership from the other owners and convert the reservoir to non-potable water storage to allow IRWD to maximize the use of reclaimed water through additional seasonal storage. Major design components required to convert the San Juaquin Reservoir include: (1) Modifications to the reservoir for repairs; (2) Construction and operation of three pump stations, one at the reservoir and two offsite; (3) Construction of a one-half million gallon storage tank to be buried at the reservoir; (4) Construction of approximately one mile of reclaimed water pipeline; and (5) Construction of a chlorination facility at the reservoir. Construction of the proposed project is anticipated begin in late 2000 and to be completed by mid-2003.

Contact Information

Name
Michael Hoolihan
Agency Name
Irvine Ranch Water District
Contact Types
Lead/Public Agency

Location

Cities
Newport Beach
Counties
Orange
Cross Streets
Bonita Canyon Dr/ Hwy 73 & Sand Canyon Avenue/I-405
Total Acres
<5(new)
State Highways
Hwy 73 and I-405
Schools
University of California-Irvine
Waterways
unnamed drainage

Notice of Completion

State Review Period Start
State Review Period End
State Reviewing Agencies
California Coastal Commission (CCC), California Department of Conservation (DOC), California Department of Fish and Wildlife, South Coast Region 5 (CDFW), California Department of Health Care Services (DHCS), California Department of Parks and Recreation, California Native American Heritage Commission (NAHC), California Regional Water Quality Control Board, Santa Ana Region 8 (RWQCB), California State Lands Commission (SLC), Department of Water Resources, Office of Historic Preservation, Resources Agency, State Water Resources Control Board, Division of Water Rights, State Water Resources Control Board, Divison of Financial Assistance, California Department of Transportation, District 12 (DOT)
State Reviewing Agency Comments
California Department of Transportation, District 12 (DOT)
Development Types
Other (Repair to existing reservoir & associatedd facilities)
Local Actions
Site Plan
Project Issues
Aesthetics, Agriculture and Forestry Resources, Air Quality, Coastal Zone, Cultural Resources, Cumulative Effects, Drainage/Absorption, Economics/Jobs, Flood Plain/Flooding, Geology/Soils, Growth Inducement, Hazards & Hazardous Materials, Hydrology/Water Quality, Land Use/Planning, Mineral Resources, Noise, Population/Housing, Public Services, Recreation, Schools/Universities, Septic System, Sewer Capacity, Solid Waste, Transportation, Vegetation, Wetland/Riparian, Wildfire, Wildlife

Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above. You may also contact the OPR via email at state.clearinghouse@opr.ca.gov or via phone at (916) 445-0613.

Download CSV New Search Print