Motherlode Forcemain Replacement Project

8 Documents in Project

Summary

SCH Number
2000082084
Lead Agency
El Dorado Irrigation District
Document Title
Motherlode Forcemain Replacement Project
Document Type
NOD - Notice of Determination
Received
Posted
2/12/2013
Present Land Use
Road ROW
Document Description
The Motherlode Forcemain (MLFM) is approximately a 9-mile sewer pipeline that extends from the El Dorado Lift Station in the town of El Dorado to the main gravity line that feeds the Deer Creek Wastewater Treatment Plant in Cameron Park. The District is preparing to install the Phase llC alignment of the MLFM. Installation of the pipeline will occur along South Shing Road, Lakeview Drive, and Oakmont Drive with a section of pipeline replaced at a stream crossing along Durock Road. The Phase llC alignment will require minor, technical changes to the Motherlode Forcemain Replacement Project Final Program EIR and Tiered Lime Road to Presley Lane Stream Crossing IS/MND. Therefore, an Addendum has been completed by the El Dorado Irrigation District in accordance with CEQA Guide Section 15164.

Contact Information

Name
Kristen Schaeffer
Agency Name
El Dorado Irrigation District
Contact Types
Lead/Public Agency

Location

Counties
El Dorado
Cross Streets
Durock Court
Total Acres
0.65
State Highways
U.S. 50
Waterways
Tributary to Deer Creek
Township
9N
Range
9E
Section
1
Base
MDBM
Other Location Info
Shingle Springs

Notice of Determination

Approving Agency
El Dorado Irrigation District
Approving Agency Role
Lead Agency
Approved On

Determinations

(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
Yes
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
No
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
N/A
(5) A Statement of Overriding Considerations was adopted for this project
No
(6) Findings were made pursuant to the provisions of CEQA
Yes

Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above. You may also contact the OPR via email at state.clearinghouse@opr.ca.gov or via phone at (916) 445-0613.