San Dieguito River Corridor Management Plan

3 Documents in Project

Summary

SCH Number
2000081115
Lead Agency
City of San Diego
Document Title
San Dieguito River Corridor Management Plan
Document Type
NOD - Notice of Determination
Received
Posted
5/23/2002
Present Land Use
Agriculture/A-1-10/Agriculture
Document Description
Resource protection ordinance permit and conditional use permit for 1) removal of non-native vegetation from the San Dieguito, Santa Maria, and Santa Ysabel riverbeds; 2) sand extraction; 3) wetlands creation; and 4) potential removal of native and non-native vegetation as needed for flood control (only in Santa Maria Creek).

Contact Information

Name
Eileen Lower
Agency Name
City of San Diego
Contact Types
Lead/Public Agency

Location

Cities
San Diego
Counties
San Diego
State Highways
SR-78/ I-15
Waterways
San Diequito River
Other Location Info
San Pasquel

Notice of Determination

Approving Agency
City of San Diego
Approving Agency Role
Lead Agency
Approved On

Determinations

(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
Yes
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
N/A
(5) A Statement of Overriding Considerations was adopted for this project
N/A
(6) Findings were made pursuant to the provisions of CEQA
N/A

Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above.

Download CSV New Search Print