American River Non Motorized Boat Improvements

2 Documents in Project

Summary

SCH Number
2000072099
Lead Agency
Sacramento County
Document Title
American River Non Motorized Boat Improvements
Document Type
NOD - Notice of Determination
Received
Posted
11/30/2001
Document Description
Three cast-in-place concrete boat launch ramps are to be constructed along the American River at Sailor Bar, Watt Avenue and Howe Avenue. The ramps will be constructed of steel reinforced concrete, with erosion-resistant cutoff walls and a grooved surface to improve vehicle and pedestrian traction. The area under and surrounding the new ramps will be graded to the proper angle (between 12 and 15 degrees), and at least six inches of compacted aggregate base will be installed as a base course. The concrete ramps will be 16 feet wide by approximately 60 feet long, and 6 inches thick. At all the ramp sites, a sixteen inch wide by 25 foot long section of the concrete ramp will be prefabricated at the site, then pushed part way into the river with a bulldozer to ensure that the ramp is usable at low flow conditions. The remainder of the ramp will then be poured in place. The pushed section of the ramp will be tied to the poured-in-place section with extra lengths of rebar sticking out of the pushed section.

Contact Information

Name
Dennis Yeast
Agency Name
Sacramento County
Contact Types
Lead/Public Agency

Location

Counties
Sacramento
State Highways
50
Waterways
American River

Notice of Determination

Approving Agency
County of Sacramento
Approving Agency Role
Lead Agency
Approved On

Determinations

(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
Yes
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
N/A
(5) A Statement of Overriding Considerations was adopted for this project
No
(6) Findings were made pursuant to the provisions of CEQA
No

Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above. You may also contact the OPR via email at state.clearinghouse@opr.ca.gov or via phone at (916) 445-0613.

Download CSV New Search Print