Phase V, Upper Sacramento Area Levee Reconstruction Project Modifications

2 Documents in Project

Summary

SCH Number
2000072092
Lead Agency
Central Valley Flood Protection Board
Document Title
Phase V, Upper Sacramento Area Levee Reconstruction Project Modifications
Document Type
NOD - Notice of Determination
Received
Posted
9/12/2000
Present Land Use
Rural / Agricultural
Document Description
Levee reconstruction work on the right bank of the Sacramento River. Site D: 0.5 miles of landside seepage stability berm RM 119.1 - 119.6. Site E: 3.1 miles slurry trench cutoff wall from RM 140.1 - 143.2 and ~700 foot setback levee from RM 140.9-141.1.

Contact Information

Name
Bonnie Ross
Agency Name
Reclamation Board
Contact Types
Lead/Public Agency

Location

Cities
Colusa
Counties
Colusa, Glenn, Sutter, Yolo
State Highways
20, 45
Waterways
Sacramento River, Colusa Bypass
Other Location Info
South of Colusa

Notice of Determination

Approving Agency
The Reclamation Board
Approving Agency Role
Lead Agency
Approved On

Determinations

(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
Yes
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
N/A
(5) A Statement of Overriding Considerations was adopted for this project
No
(6) Findings were made pursuant to the provisions of CEQA
N/A

Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above.

Download CSV New Search Print