Long Point Resort Project (General Plan Amendment #28 Coastal Permit #166, Conditional Use Permit #215 & 216, Tentative Parcel Map # 26073 & Grading Permit);

4 Documents in Project

Summary

SCH Number
2000071076
Lead Agency
City of Rancho Palos Verdes
Document Title
Long Point Resort Project (General Plan Amendment #28 Coastal Permit #166, Conditional Use Permit #215 & 216, Tentative Parcel Map # 26073 & Grading Permit);
Document Type
NOD - Notice of Determination
Received
Posted
5/9/2003
Present Land Use
Resort Hotel Area: Commercial-Recreational; Urban Activities and Socio-Cultural Overlay Control Districts; and Specific Plan District. Upper Point Vicente Area: Recreational Passive; institutional Public; and Natural Overlay Control District. Zoning: Resort Hotel Area: Commercial Recreational (CR) and Open Space-Hazard (OH). Upper Point Vicente Area: Open Space Recreational (OR) and Institutional (l).
Document Description
Alter the streambed and bank by the development of a 102.1-acre site, incroporating a mixture of conservation, public coastal access and open space, recreational elements (46.6 acres), and a resort hotel element (55.6 acres), known as the Long Point Resort Project within the City of Rancho Palos Verdes.

Contact Information

Name
Ara Mihranian
Agency Name
City of Rancho Palos Verdes
Contact Types
Lead/Public Agency

Location

Cities
Rancho Palos Verdes
Counties
Los Angeles
Cross Streets
Palos Verdes Drive South/Hawthorne Boulevard
Total Acres
168.4
Jobs
700
Parcel #
Multiple
Waterways
Pacific Ocean
Township
5S
Range
15W

Notice of Determination

Approving Agency
California Department of Fish and Game
Approving Agency Role
Responsible Agency
Approved On

Determinations

(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
Yes
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
No
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
N/A
(5) A Statement of Overriding Considerations was adopted for this project
No
(6) Findings were made pursuant to the provisions of CEQA
Yes

Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above. You may also contact the OPR via email at state.clearinghouse@opr.ca.gov or via phone at (916) 445-0613.

Download CSV New Search Print