East Campus Utilities Plant, Medical Center Drive Realignment and Surface Parking

3 Documents in Project

Summary

SCH Number
2000071006
Lead Agency
University of California San Diego
Document Title
East Campus Utilities Plant, Medical Center Drive Realignment and Surface Parking
Document Type
NOD - Notice of Determination
Received
Posted
9/18/2000
Document Description
The East Campus Utilities Plant (ECUP) would centralize chilled water and emergency power for non-hospital uses in the East Campus Health Sciences (ECHS) neighborhood. The initial construction is designed to accommodate the chilled water and emergency energy demands of the existing Ratner Eye Center, the existing Shiley Eye Center (and a potential building expansion at Shiley Eye Center), as well as the proposed UCSD Cancer Center. Initial construction would increase a 6,750-square-foot single-story, high bay central plant building as well as two 900-ton electric-driven centifugal chillers, condensed and chilled water pumps, cooling towers, a 12 k V electrical substation, two 1,000 W/1, 250k V a diesel engine-driven generators, and two 10,000-gallon underground fuel tanks. At buildout, the ECUP would house a total of five chillers and four generators.

Contact Information

Name
Catherine Presmyk
Agency Name
University of California San Diego
Contact Types
Lead/Public Agency

Location

Cities
La Jolla
Counties
San Diego
Cross Streets
Campus Point Dr. / Health Sciences Dr. / Medical Center Dr.
Total Acres
9.4
State Highways
5
Railways
NCTD Coaster & Amtrak
Township
15S
Range
3W
Section
16
Base
La Jolla

Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above. You may also contact the OPR via email at state.clearinghouse@opr.ca.gov or via phone at (916) 445-0613.