Laguna Stonelake Sewer Force Main - Phase 2

2 Documents in Project

Summary

SCH Number
2000062153
Lead Agency
Sacramento County
Document Title
Laguna Stonelake Sewer Force Main - Phase 2
Document Type
NOD - Notice of Determination
Received
Posted
8/15/2000
Document Description
The proposed project would extend a 12-inch diameter sewer force main from the southern boundary of the SRCSD property for about 3,300 feet north to Sims Road. The work begins at a channel crossing of a concrete lined man-made open channel. From there it runs north parallel to the UPRR track. The first 300 feet run through a paved water storage tank site. The remaining 3,000 feet of force main runs through SRCSD buffer lands. At Sims Road the force main discharges to a 21-inch gravity sewer line that crosses under the UPRR tracks and connects to a 33-inch gravity line. An odor control station will be installed to treat any gases generated at the point of discharge. The odor control station will be located 1,600 feet west of the discharge point to the odor control station. The odor control station will be a package system approximately 10 feet wide by 25 feet long. A blower will pull air through the air duct and run it through biofiltration modules. The unit will require approximately 10 gallons of water per day, and will operate continuously.

Contact Information

Name
Dennis E. Yeast
Agency Name
County of Sacramento, Depart. of Environmental Review&Assessment
Contact Types
Lead/Public Agency

Location

Cities
Elk Grove
Counties
Sacramento
Cross Streets
Franklin Blvd. & Laguna Blvd.
Parcel #
119-0120-004
State Highways
I-5
Railways
Union Pacific
Waterways
Sacramento River

Notice of Determination

Approving Agency
County of Sacramento
Approving Agency Role
Lead Agency
Approved On

Determinations

(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
Yes
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
N/A
(5) A Statement of Overriding Considerations was adopted for this project
No
(6) Findings were made pursuant to the provisions of CEQA
No

Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above. You may also contact the OPR via email at state.clearinghouse@opr.ca.gov or via phone at (916) 445-0613.

Download CSV New Search Print