Recycled Water Treatment, Storage & Distribution System Pipeline Improvements (Project); Clean Water State Revolving Fund )CWSRF) Mp. C-06-8072-110, C-06-8072-1

19 Documents in Project

Summary

SCH Number
2000062030
Lead Agency
Pajaro Valley Water Management Agency
Document Title
Recycled Water Treatment, Storage & Distribution System Pipeline Improvements (Project); Clean Water State Revolving Fund )CWSRF) Mp. C-06-8072-110, C-06-8072-1
Document Type
NOD - Notice of Determination
Received
Posted
3/16/2016
Present Land Use
Wastewater Treatment Facility, Recycled Water Facility / Public-Quasi Public
Document Description
The upgrade of the agency's RWF consists of two components: recycled water storage and distribution pump station improvements, and filtration and disinfection improvements. The project includes construction of Tanks No. 2 and No. 3, approximately 1,000 linear feet of new 6 to 24 inch diameter steel and plastic pipe, 500 linear feet of multiple 1 to 2.5 inch diameter conduits within a single trench, a new disk filtration module structure, installation of new pumps on concrete slabs in the existing distribution pump station structure, and installation of 600 additional ultra-violet lamps and associated equipment within the existing disinfection structure.

Contact Information

Name
Carina Grove
Agency Name
State Water Resources Control Board
Contact Types
Lead/Public Agency

Location

Cities
Watsonville
Counties
Monterey, Santa Cruz
State Highways
Hwy 101/129
Railways
SPRR, UPRR
Airports
Watsonville Municipal
Waterways
Pajaro River, College Lake, Pinto LakeCorralitos Creek, Watsonville Slough

Notice of Determination

Approving Agency
State Water Board
Approving Agency Role
Responsible Agency
Approved On

Determinations

(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
Yes
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
No
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
N/A
(5) A Statement of Overriding Considerations was adopted for this project
No
(6) Findings were made pursuant to the provisions of CEQA
N/A