Agreement 2008-0105-R4 - Brinan Pit Sand and Gravel Mine - Swift Tectonics

3 Documents in Project

Summary

SCH Number
2000061110
Lead Agency
Monterey County
Document Title
Agreement 2008-0105-R4 - Brinan Pit Sand and Gravel Mine - Swift Tectonics
Document Type
NOD - Notice of Determination
Received
Posted
10/1/2009
Present Land Use
Existing instream sand and gravel mining and cattle grazing. Present General Plan: Farmlands and permanent grazing.
Document Description
The California Department of Fish and Game is executing a Lake and Streambed Alteration Agreement pursuant to Section 1602 of the Fish and Game Code to the Project applicant, John Cederquist, Swift Tectonics, Inc. The project consists of the continued operation of an existing 60 acre commercial sand and gravel mine, wherein amounts of up to up to 60,000 cubic yards of sand and gravel will be extracted annually from the channel of Pancho Rico Creek. Gravel is removed with dozers and scrapers and stockpiled in a processing area which is located adjacent to the creek, out of the creek channel, and materials area processed into rock, gravel and sand products. Extraction will be limited to 6 feet in depth, to bedrock, and will occur in the dry season when no surface or subsurface water is present.

Contact Information

Name
Julie Means
Agency Name
California Department of Fish and Game
Contact Types
Lead/Public Agency

Location

Cities
San Ardo
Counties
Monterey
Cross Streets
Pancho Rico & Sargents Roads
Zip
93450
Parcel #
422-111-030, 422-111-015, 422-111-017
State Highways
101
Railways
Union Pacific
Waterways
Pancho Rico Creek, Salinas River
Township
21S
Range
10
Section
15, 10

Notice of Determination

Approving Agency
California Department of Fish and Game
Approving Agency Role
Responsible Agency
Approved On

Determinations

(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
Yes
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
N/A
(5) A Statement of Overriding Considerations was adopted for this project
No
(6) Findings were made pursuant to the provisions of CEQA
Yes

Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above. You may also contact the OPR via email at state.clearinghouse@opr.ca.gov or via phone at (916) 445-0613.