Mulholland Water Pipeline Project

3 Documents in Project

Summary

SCH Number
2000061066
Lead Agency
City of Los Angeles
Document Title
Mulholland Water Pipeline Project
Document Type
EIR - Draft EIR
Received
Present Land Use
Low-Minimum Density RL-RE4-RE15-RA and OS
Document Description
The proposed project involves 15,200 linear feet (approximately 29 miles) of new 16-inch diameter piping along paved and unpaved portions of Mulholland Drive from Picasso Avenue to Greenbriar Drive in Woodland Hills. The pipeline would convey supplemental water from the existing corbin Tank to residents living in the Woodland Hills and southeastern San Fernando Valley. A subsurface regulating station, data collection cabinet and valves would also be constructed. The proposed project would take approximately 18-20 months to complete.

Contact Information

Name
Kelvin Lew
Agency Name
City of Los Angeles Department of Water and Power
Contact Types
Lead/Public Agency

Location

Counties
Los Angeles
Cross Streets
Topanga Canyon Boulevard and Mulholland Drive
Zip
91364
Total Acres
3.49
Parcel #
Roadway Easement
State Highways
27
Township
1N
Range
16W
Section
29/30
Other Location Info
City/Nearest Community: Woodland Hills

Notice of Completion

State Review Period Start
State Review Period End
State Reviewing Agencies
California Department of Fish and Wildlife, South Coast Region 5 (CDFW), California Department of Health Care Services (DHCS), California Department of Parks and Recreation, California Highway Patrol, California Native American Heritage Commission (NAHC), California Regional Water Quality Control Board, Los Angeles Region 4 (RWQCB), California State Lands Commission (SLC), Department of Water Resources, Office of Historic Preservation, Resources Agency, State Water Resources Control Board, Divison of Financial Assistance, California Department of Transportation, District 7 (DOT)
State Reviewing Agency Comments
California Department of Transportation, District 7 (DOT)
Development Types
Water Facilities (16-inch pipeline)
Local Actions
Water pipeline construction

Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above.

Download CSV New Search Print