Valley of the Moon Water District: Crest Tank Replacement Project

2 Documents in Project

Summary

SCH Number
2000052013
Lead Agency
Valley of the Moon Water District
Document Title
Valley of the Moon Water District: Crest Tank Replacement Project
Document Type
NOD - Notice of Determination
Received
Posted
6/28/2000
Present Land Use
Rural Residential, B6, 5 acres/dwelling unit
Document Description
The Valley of the Moon Water District proposes to increase the water storage capacity at its Crest tank site in Boyes Hot Springs from the existing 150,000 gallon capacity to between 500,000 and 800,000 gallons. The existing redwood tank would be dismantled and replaced with either a single 64 foot diameter or two 46 foot diameter welded steel tanks. The height of the tanks will be either 20 feet or 32 feet. In addition to the new tanks, approximately 400 linear feet of existing 8-inch steel pipeline would be replaced with a new 8-inch PVC pipeline. The pipeline replacement would extend from the new tanks through an existing easement to connect with existing piping near Highland Avenue and Crest Way.

Contact Information

Name
Agency Name
Valley of the Moon Water District
Contact Types
Lead/Public Agency

Location

Cities
El Verano
Counties
Sonoma
Cross Streets
Highland Avenue and Crest Avenue
Zip
95433
Total Acres
less than 1
Parcel #
056-341-011 and -027
State Highways
12
Waterways
Sonoma Creek
Base
MD

Notice of Determination

Approving Agency
Valley of the Moon Water District
Approving Agency Role
Lead Agency
Approved On

Determinations

(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
Yes
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
N/A
(5) A Statement of Overriding Considerations was adopted for this project
No
(6) Findings were made pursuant to the provisions of CEQA
No

Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above. You may also contact the OPR via email at state.clearinghouse@opr.ca.gov or via phone at (916) 445-0613.