Big Canyon Country Club Storm Drain Project-Pond Fill, Storm Drain and Sewer Trunk Line

4 Documents in Project

Summary

SCH Number
2000051118
Lead Agency
City of Newport Beach
Document Title
Big Canyon Country Club Storm Drain Project-Pond Fill, Storm Drain and Sewer Trunk Line
Document Type
NOD - Notice of Determination
Received
Posted
12/11/2001
Present Land Use
Existing golf course with pond and golf uses/ Zoning: recreation, general plan: open space.
Document Description
The application is a request to permit the approval of a Grading Permit for the Big Canyon Country Club to allow the placement of fill materials within an existing pond approximately 28,000 square feet in size and construction of associated improvements. Improvements include drainage pipes underground and above surface that will connect to the existing storm drains, removal and construction of golf cart paths, adjustment of manholes to grade, and relocation of an existing water line. The pond, once filled, will be landscaped and replaced with a putting green to compliment the existing golf course uses and the driving range depth will be expanded to provide additional distance.

Contact Information

Name
Javier S. Garcia
Agency Name
City of Newport Beach
Contact Types
Lead/Public Agency

Location

Cities
Newport Beach
Counties
Orange
Cross Streets
Big Canyon Drive & San Joaquin Hills Road
Zip
92660
Total Acres
0.64
Parcel #
442-032-069
State Highways
Pacific Coast Highway
Waterways
USGS- Laguna Beach Quadrangle
Other Information
Total acres: plus 1,100 feet of sewer trunk line

Notice of Determination

Approving Agency
City of Newport Beach, Building Official
Approving Agency Role
Lead Agency
Approved On

Determinations

(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
Yes
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
N/A
(5) A Statement of Overriding Considerations was adopted for this project
No
(6) Findings were made pursuant to the provisions of CEQA
Yes

Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above.

Download CSV New Search Print