River Park Specific Plan

6 Documents in Project

Summary

SCH Number
2000051046
Lead Agency
City of Oxnard
Document Title
River Park Specific Plan
Document Type
NOD - Notice of Determination
Received
Posted
7/23/2002
Present Land Use
(C-2-PD) General Commercial - Planned Development; (R-1) Single Faily Residential; (C-R) Community Reserve; (M-1-PD) Light Manufacturing - Planned Development; (O-S) Open Space; Mineral Resource Protection Overlay
Document Description
The River Park Specific Plan would permit the development of an integrated mixed-use community consisting of open space, residential, commercial, and public facilities uses. The community design of River Park follows the design principles of the "New Urbanism" and "Smart Growth" movements which emphasize the importance of mixed land use, communities scaled for pedestrian movement, limiting atomobile usage and the importance of physical design in creating communities that people want to live, work and shop in. The River Park would be made up of four basic land uses: 1) the commercial area proposed within the southern portion of River Park Area 'A'; 2) the residential neighborhoods proposed to the north and east of the commercial areas; 3) the open space area proposed in the northern portion of the Specific Plan Area; and 4) public facilities. These land use areas would be linked and unified by a landscaped pedestrian, bicycle, and vehicular circulation system. The existing mine pits on the site will be reclaimed as water storage and recharge basins to provide for additional recharge of the Oxnard Aquifer System.

Contact Information

Name
Gary Sugano
Agency Name
City of Oxnard
Contact Types
Lead/Public Agency

Location

Cities
Oxnard
Counties
Ventura
Cross Streets
US 101/Vineyard Avenue
Total Acres
701
State Highways
US 101/SR 232
Waterways
Santa Clara River

Notice of Determination

Approving Agency
Marilyn Miller
Approving Agency Role
Lead Agency
Approved On

Determinations

(1) The project will have a significant impact on the environment
Yes
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
Yes
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
No
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
N/A
(5) A Statement of Overriding Considerations was adopted for this project
Yes
(6) Findings were made pursuant to the provisions of CEQA
Yes

Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above. You may also contact the OPR via email at state.clearinghouse@opr.ca.gov or via phone at (916) 445-0613.

Download CSV New Search Print