Sheffield Reservoir Water Quality and Open Space Project
6 Documents in Project
Summary
SCH Number
2000041126
Lead Agency
City of Santa Barbara
Document Title
Sheffield Reservoir Water Quality and Open Space Project
Document Type
NOD - Notice of Determination
Received
Posted
1/17/2002
Present Land Use
Major Public and Institutional; A-1, Residential, One acre minimum lot size.
Document Description
The project would involves the demolition of Sheffield dam, reservoir and Filtration Building and the construction of two 6.5 million gallon buried reservoirs. A 900 square feet control building may be constructed to store up to 100 gallons of disinfectant chemicals. A passive open space will be constructed over the buried tanks, including native vegetation, a split rail fence, trails and a small parking lot. Approximately 5,000 square feet of the existing Filtration Building will be incorporated into the open space design. The existing Firescape Garden and Canine Training Facility would remain.
Contact Information
Name
Pat Saley
Agency Name
City of Santa Barbara
Contact Types
Lead/Public Agency
Phone
Location
Cities
Santa Barbara
Counties
Santa Barbara
Cross Streets
Mountain Drive and Mission Ridge Road
Total Acres
23
Parcel #
021-120-011
State Highways
192, 144
Waterways
Mission Creek, Sycamore Creek
Notice of Determination
Approving Agency
City of Santa Barbara
Approving Agency Role
Lead Agency
Approved On
Determinations
(1) The project will have a significant impact on the environment
Yes
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
Yes
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
No
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
N/A
(5) A Statement of Overriding Considerations was adopted for this project
Yes
(6) Findings were made pursuant to the provisions of CEQA
Yes
Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above.