24-Inch University Drive Parallel Reclaimed Water Pipeline

3 Documents in Project

Summary

SCH Number
2000041079
Lead Agency
Irvine Ranch Water District
Document Title
24-Inch University Drive Parallel Reclaimed Water Pipeline
Document Type
NOD - Notice of Determination
Received
Posted
6/22/2000
Present Land Use
Street R.W. & Bore under San Diego Creek
Document Description
CDFG has issued an Agreement regarding proposed SAA #5-082-00 to Irvine Ranch Water District in conjunction with the applicant's proposal to alter the streambed to construct a 12,000 linear foot 24 inch reclaimed water pipeline to accommodate an increased reclamed water supply from Michelson Water Reclamation Plant (MWRP). The 24-inch pipeline would be encased in a 42-inch casing pipe that would be bored and jacked 7' below the San Diego Creek Channel bottom. The bore pit would be 40' x 15' x 32' deep and would be located out of the creek channel right-of-way, beyond the creek bank. The proposed project will have no impact to the bed and bank of the stream channel. The proposed project is designed to avoid the bed and bank of the stream channel. If the stream's bed and bank are disturbed in any way, the Department shall be notified immediately.

Contact Information

Name
Leslie MacNair
Agency Name
California Department of Fish and Game
Contact Types
Lead/Public Agency

Location

Cities
Irvine
Counties
Orange

Notice of Determination

Approving Agency
California Department of Fish and Game
Approving Agency Role
Responsible Agency
Approved On

Determinations

(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
Yes
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
N/A
(5) A Statement of Overriding Considerations was adopted for this project
No
(6) Findings were made pursuant to the provisions of CEQA
Yes

Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above. You may also contact the OPR via email at state.clearinghouse@opr.ca.gov or via phone at (916) 445-0613.

Download CSV New Search Print