Replacement and Rehabilitation of the Back Bay Trunk Sewer

2 Documents in Project

Summary

SCH Number
2000041074
Lead Agency
Orange County Sanitation District
Document Title
Replacement and Rehabilitation of the Back Bay Trunk Sewer
Document Type
NOD - Notice of Determination
Received
Posted
6/15/2000
Present Land Use
Open space along the Santa Ana River
Document Description
The Orange County Sanitation District (OCSD) proposes a project to rehabilitate (by lining) and replace a major portion of the Back Bay Trunk Sewer (BBTS), Contract No. 5-46 to prevent further deterioration. The proposed project, alternative B-1 of the February 2000 Preliminary Design Report by Tran Consulting Engineers, calls for lining of the existing pipe which lies within Big Canyon and paralleling the remaining portions of the pipeline with two plastic pipelines (each being 30 inches in diameter). The construction would be staged in various segments to facilitate construction that requires road closures and tie-ins with the existing pipeline. At critical junction points, new junction structures would be constructed along with new manholes along the route. A Spill Prevention Program will be an important element of the construction and tie-ins.

Contact Information

Name
Mark Tomko
Agency Name
Orange County Sanitation District
Contact Types
Lead/Public Agency

Location

Cities
Newport Beach
Counties
Orange
Cross Streets
Jamboree
State Highways
1
Other Location Info
Big Canyon and Back Bay Drive adjacent to Newport Bay

Notice of Determination

Approving Agency
Orange County Sanitation District
Approving Agency Role
Lead Agency
Approved On

Determinations

(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
Yes
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
N/A
(5) A Statement of Overriding Considerations was adopted for this project
No
(6) Findings were made pursuant to the provisions of CEQA
N/A

Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above. You may also contact the OPR via email at state.clearinghouse@opr.ca.gov or via phone at (916) 445-0613.

Download CSV New Search Print