Inland Empire Utilities Agency Recycled Water Groundwater Recharge Project
19 Documents in Project
Summary
SCH Number
2000041047
Lead Agency
Inland Empire Utilities Agency
Document Title
Inland Empire Utilities Agency Recycled Water Groundwater Recharge Project
Document Type
NOD - Notice of Determination
Received
Posted
3/26/2003
Document Description
Phase 1 of the proposed project consists of six construction sites including: 1) The Etiwanda Avenue Regional Recycled Water Pipeline, which consists of approximately 5,000 feet of 36-inch pipe and support facilities that will be installed in existing road right-of-ways and at existing industrial/public infrastructure sites; 2) The Wineville Avenue Regional Recycled Water Pipeline which consists of construction of a recycled water pipeline from the RP-4 outfall to the Inland Paperboard and Package on Jurupa Street; 3) The Fourth Street Regional Recycled Water Pipeline which consists of approximately 21,000 feet of 24-30 inch pipeline to be installed within existing road easements; 4) The Philadelphia Street Regional Recycled Water Pipeline which consists of approximately 9,840 feet of 24-03 inch pipeline to be installed within existing road easements; 5) The North Etiwanda Extension Regional Recycled Water Pipeline which consists of approximately 3,000 feet of 36-inch pipeline to be installed between the power plant and Whittram Avenue and will connect with the recycled water pipeline in Whittram Avenue; and 6) The Regional Plant No. 1 and Regional Plant No. 4 Recycled Water Pump Stations which consists of expanding the existing chlorine disinfection system at RP-1 by adding a chlorine contact basin just south of the two existing basins.
Contact Information
Name
James Hockenberry
Agency Name
State Water Resources Control Board
Contact Types
Lead/Public Agency
Phone
Location
Cities
Fontana
Counties
San Bernardino
Other Location Info
Northwest Riverside
Notice of Determination
Approving Agency
State Water Resources Control Board
Approving Agency Role
Responsible Agency
Approved On
Determinations
(1) The project will have a significant impact on the environment
Yes
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
Yes
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
No
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
N/A
(5) A Statement of Overriding Considerations was adopted for this project
No
(6) Findings were made pursuant to the provisions of CEQA
N/A
Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above.