Addendum to the Peace II Project Subsequent Environmental Impact Report

19 Documents in Project

Summary

SCH Number
2000041047
Lead Agency
Inland Empire Utilities Agency
Document Title
Addendum to the Peace II Project Subsequent Environmental Impact Report
Document Type
NOD - Notice of Determination
Received
Posted
3/26/2012
Document Description
One of the potential negative effects of substantial pumping of groundwater in the southern portion o f the Chino Basin in the potential to cause subsidence of the sediments that underlie this portion of the Basin. This issue was also extensively discussed in the Peace II Project Subsequent Environmental Impact Report (SEIR) and mitigation (Mitigation Measure 4.3-9 of the SEIR) is required to monitor subsidence and use adaptive management techniques to control subsidence if it is observed. To effectively monitor potential subsidence in the southern portion of the Chino Basin, the Watermaster is proposing to install a subsidence monitoring system termed an "extensometer." As a requirement of the Peace II Project SEIR, the "Chino Creek Extensometer Facility" (proposed project) is designed as a key subsidence monitoring system that will be installed under the Peace II Project SEIR. After reviewing the proposed Extensometer Facility location and potential environmental impacts, it was concluded that this proposed project could best meet compliance with the California Environmental Quality Act (CEQA) through preparation and consideration of an Addendum to the Peace II Project SEIR.

Contact Information

Name
Chris Berch
Agency Name
Inland Empire Utilities Agency
Contact Types
Lead/Public Agency

Location

Counties
San Bernardino
State Highways
60, I-15, I-10
Railways
UPRR, BNSF
Airports
Ontario, Chino
Schools
Several
Waterways
Several: Chino, Cucamonga, San Servaine
Base
SBB&M
Other Location Info
Several

Notice of Determination

Approving Agency
Inland Empire Utilities Agency
Approving Agency Role
Lead Agency
Approved On

Determinations

(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
Yes
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
No
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
N/A
(5) A Statement of Overriding Considerations was adopted for this project
No
(6) Findings were made pursuant to the provisions of CEQA
N/A

Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above. You may also contact the OPR via email at state.clearinghouse@opr.ca.gov or via phone at (916) 445-0613.