Airport Temporary Holding Facility (Sprung Structure)
6 Documents in Project
Download CSV
New Search
Print
Summary
- SCH Number
- 2000034005
- Lead Agency
- Mammoth Lakes, City of (City of Mammoth Lakes)
- Document Title
- Airport Temporary Holding Facility (Sprung Structure)
- Document Type
- NOD - Notice of Determination
- Received
- Posted
- 8/1/2011
- Present Land Use
- General Plan-Airport; zoning - Airport
- Document Description
- The Project is a temporary holding facility at the Mammoth Yosemite Airport. The facility will consists of a sprung tent-type structure that will be located on a concrete slab. The dimensions of the sprung structure will be approximately 30 feet wide, 75 feet long, and less than 19 feet tall. The facility will include seating area, bathroom, snack bar, and a bar area. Existing utilities will be extended to serve this facility. The sprung will be an olive green color and aspen trees will be planted to the south of the structure.
- Contact Information
-
Jen Daugherty
Town of Mammoth Lakes
P.O Box 1609
Mammoth Lakes, CA 93546
Phone : 760 934 8989 x260
Location
- Cities
- Mammoth Lakes
- Counties
- Mono
- Cross Streets
- U.S. 395 and Hot Creek Fish Hatchery Road
- Zip
- 93546
- Total Acres
- 200
- Parcel #
- 37-250-04
- State Highways
- 395
- Airports
- MMH
- Waterways
- Hot Creek
- Township
- 3S
- Range
- 28E
- Section
- 1&2
- Base
- MDBM
Notice of Determination
- Approving Agency
- Mammoth Lakes Planning Commission
- Approving Agency Role
- Lead Agency
- Approved On
- Final Environmental Document Available at
- Mammoth Lakes Town Offices, 437 Old Mammoth Road, Suite R, Mammoth Lakes, CA 93546
Determinations
- (1) The project will have a significant impact on the environment
- Yes
- (2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
- Yes
- (2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
- No
- (2c) An other document type was prepared for this project pursuant to the provisions of CEQA
- No
- (3) Mitigated measures were made a condition of the approval of the project
- Yes
- (4) A mitigation reporting or monitoring plan was adopted for this project
- N/A
- (5) A Statement of Overriding Considerations was adopted for this project
- Yes
- (6) Findings were made pursuant to the provisions of CEQA
- Yes
Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above. You may also contact the OPR via email at state.clearinghouse@opr.ca.gov or via phone at (916) 445-0613.