Sierra Conservation Center (SCC) Jamestown Effluent Disposal Pipeline Project

5 Documents in Project

Summary

SCH Number
2000032127
Lead Agency
California Department of Corrections and Rehabilitation (CDCR)
Document Title
Sierra Conservation Center (SCC) Jamestown Effluent Disposal Pipeline Project
Document Type
NOD - Notice of Determination
Received
Posted
5/24/2001
Document Description
The California Department of Corrections proposes to build and operate a disposal system for effluent generated and treated at the Sierra Conservation Center (SCC) near Jamestown in Tuolumne County, California. The project would construct an eight mile (approximately 41,000 ft.) long 12-inch pipeline to transport and dispose of up to 600,000 gallons per day of effluent from the new tertiary treatment facility at SCC. The project would install a new pump station at SCC, construct a 350 acre-foot capacity effluent storage reservoir on a 23-acre remote site, and provide effluent to irrigate 300 acres of existing pasture land. The pump station would move the recycled water from SCC, distribute to sprayfields along the way, and transport excess wastewater to the storage reservoir. The reservoir would require an earthen dam and a smaller spillway dam. Approximately 30,000 cubic yards of suitable material would be imported for a portion of the dam fill. The spillway dam would include an overflow structure to allow the effluent to be directed into a drainage ditch within the Woods Creek watershed.

Contact Information

Name
Maria C. Sosa
Agency Name
California Department of Corrections
Contact Types
Lead/Public Agency

Location

Cities
Jamestown
Counties
Tuolumne
Zip
95327
State Highways
104/120/49
Railways
Sierra Railroad
Waterways
Tuolumne River/Stanislaus River

Notice of Determination

Approving Agency
California Department of Corrections
Approving Agency Role
Responsible Agency
Approved On

Determinations

(1) The project will have a significant impact on the environment
Yes
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
Yes
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
No
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
N/A
(5) A Statement of Overriding Considerations was adopted for this project
No
(6) Findings were made pursuant to the provisions of CEQA
Yes