Windsor Creek Flood Bypass Inlet and Outlet Structures
6 Documents in Project
Summary
SCH Number
2000032065
Lead Agency
Town of Windsor
Document Title
Windsor Creek Flood Bypass Inlet and Outlet Structures
Document Type
NOD - Notice of Determination
Received
Posted
10/8/2002
Present Land Use
Sites currenty undeveloped. General Plan classifications include: High Density Residential (12-16 DU/AC), Village Residential/Medium Density Residential (5-8 DU/AC), Surrounding Residential/Low/Medium Density (3-6 DU/AC, Neighborhood Center/Mixed Use, Elementary School and park sites/Light Industrial; Zoning: AE-F2-B5, 20-acre minimum (Exclusive Agriculture, Secondary Floodplain)/M1 (Limited Industrial).
Document Description
As part of the mitigation required for the Vintage Greens subdivision, Phil Trowbridge/Demada L.L.C. proposes to construct inlet and outlet structures for a flood control bypass conduit around a portion of Windsor Creek which is constricred and prone to causing upstream flooding. At the inlet a broadcrested rock weir, approximately 110 feet long, will prevent low flows from entering the bypass, yet still provide flood protection at 10-year events and greater. The downstream end of the bypass channel will also be armored with rock to prevent erosion. The California Department of Fish and Game is executing a Lake and Streambed Alteration Agreement Number R3-2002-0670 pursuant to Section 1603 of the Fish and Game Code to the projet operator, Phil Trowbridge /Demada, L.L.C.
Contact Information
Name
Gene Geary
Agency Name
Department of Fish and Game, Region 3
Contact Types
Lead/Public Agency
Phone
Location
Cities
Windsor
Counties
Sonoma
Cross Streets
Windsor Road/Wilson Lane
Zip
95492
Total Acres
119+
Parcel #
164-130-003, 005
State Highways
101
Railways
Northwest Pacific
Airports
Sonoma County
Schools
Windsor Unified
Waterways
Russian River
Notice of Determination
Approving Agency
Department of Fish and Game, Region 3
Approving Agency Role
Responsible Agency
Approved On
Determinations
(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
Yes
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
N/A
(4) A mitigation reporting or monitoring plan was adopted for this project
N/A
(5) A Statement of Overriding Considerations was adopted for this project
N/A
(6) Findings were made pursuant to the provisions of CEQA
N/A
Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above.