Goleta Slough Desilting Project

13 Documents in Project

Summary

SCH Number
2000031092
Lead Agency
Santa Barbara County Flood Control District
Document Title
Goleta Slough Desilting Project
Document Type
NOD - Notice of Determination
Received
Posted
3/27/2015
Document Description
CDFW is intending to execute a Lake and Streambed Alteration Agreement pursuant to Section 1602 of the Fish and Game Code (# 1600-2014-0237-R5) to the Project applicant, Seth Shank of the Santa Barbara County Flood Control District. The District routinely assesses conditions within each of the creeks to determine if desilting is necessary to fulfill the program objectives of increasing biological function of the system and protecting public and private land interests. The Tecolotito and Los Cerneros Creek Basins are typically desilted utilizing and the material is stockpiled and dewatered prior to beach replenishment or upland disposal. Atascadero, San Jose, and San Pedro creeks are primarily hydraulically desilted; however they may also be proposed for draglining if conditions are appropriate for implementation. During hydraulic desilting of Atascadero, San Pedro and San Jose creeks, sediment removed is directly discharged to Goleta Beach for beach replenishment.

Contact Information

Name
Natasha Lohmus
Agency Name
CDFW
Contact Types
Lead/Public Agency

Location

Cities
Goleta, Santa Barbara
Counties
Santa Barbara
Cross Streets
Hwy 217 & Sandspit Rd
Zip
93117
Parcel #
073-450-003,071-210-001,071-190...
State Highways
101
Railways
Amtrak
Airports
Santa Barbara Municipal
Waterways
Pacific Ocean

Notice of Determination

Approving Agency
CDFW
Approving Agency Role
Responsible Agency
Approved On

Determinations

(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
Yes
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
No
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
N/A
(5) A Statement of Overriding Considerations was adopted for this project
No
(6) Findings were made pursuant to the provisions of CEQA
Yes

Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above. You may also contact the OPR via email at state.clearinghouse@opr.ca.gov or via phone at (916) 445-0613.