AT&T Fiber Optic Cable Project - General Lease - Right of Way Use, and Amendment of Lease

2 Documents in Project

Summary

SCH Number
2000031062
Lead Agency
California State Lands Commission
Document Title
AT&T Fiber Optic Cable Project - General Lease - Right of Way Use, and Amendment of Lease
Document Type
NOD - Notice of Determination
Received
Posted
6/29/2000
Present Land Use
Several telecommunication cables are located in the offshore areas of Morro Bay and Point Arena where AT&T's cables are proposed to be located. The onshore landing at Morro Bay is in a paved parking lot at Montana de Oro State Park. The landing at Manchester is on fee-owned property surrounded by Manchester Beach State Park.
Document Description
Construct five 5-inch diameter steel conduits and the installation of two fiber optic cables (segment 8 and 9) at Manchester State Beach. Segment 8 would be connected at Manchester State Beach and would extend westward across the Pacific Ocean and provide a direct link with Japan. One end of Segment 9 would also land at Manchester State Beach and the other end of Segment 9 would land at Montana DeOro State Beach in San Luis Obispo County into an existing conduit.

Contact Information

Name
Paul D. Thayer
Agency Name
California State Lands Commission
Contact Types
Lead/Public Agency

Location

Cities
Morro Bay, Point Arena
Counties
Mendocino, San Luis Obispo
Cross Streets
Montana De Oro State Park and Manchester Beach State Park
Waterways
Morro Bay, Pacific Ocean
Other Location Info
Pacific Ocean from Manchester State Beach, Mendocino County and Pacific Ocean from Montana DeOro State Beach in San Luis Obispo County

Notice of Determination

Approving Agency
California State Lands Commission
Approving Agency Role
Lead Agency
Approved On

Determinations

(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
Yes
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
N/A
(5) A Statement of Overriding Considerations was adopted for this project
N/A
(6) Findings were made pursuant to the provisions of CEQA
N/A

Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above. You may also contact the OPR via email at state.clearinghouse@opr.ca.gov or via phone at (916) 445-0613.