Atascadero State Hospital Security Fence Project

4 Documents in Project

Summary

SCH Number
2000031006
Lead Agency
California Department of Health Care Services, Mental Health Services Division (MHSD, DHCS)
Document Title
Atascadero State Hospital Security Fence Project
Document Type
NOD - Notice of Determination
Received
Posted
3/2/2000
Present Land Use
Public Facility
Document Description
The proposed project would construct an 8 foot high roof-mounted security fence along the front of the hospital administration building and a 16 foot high ground-level security fence along the southwestern perimeter of the hospital. The no-climb wire mesh fence with razor wire would be equipped with disturbance alarms. The fence would run north/south, parallel to the hospital perimeter road on the west side of an unnamed drainage creek. The proposed fence would cross the unnamed drainage at two locations. Culverts would be installed at the drainage crossings. The proposed fencing would connect into the existing security fence and would fully secure the perimeter of the hospital which is currently unfenced in the proposed project location. The project is needed to protect hospital staff and the community from potentially dangerous patients by preventing escapes.

Contact Information

Name
Carol Roland
Agency Name
California Department of Mental Health
Contact Types
Lead/Public Agency

Location

Cities
Atascadero
Counties
San Luis Obispo
Cross Streets
El Camino Real/Highway 101
Zip
93422
State Highways
Hwy 101
Schools
Santa Rosa Elementary School
Waterways
Salinas River
Township
28S
Range
12E
Other Information
Section: Asuncion Grant

Notice of Determination

Approving Agency
N/A

Determinations

(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
Yes
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
No
(4) A mitigation reporting or monitoring plan was adopted for this project
N/A
(5) A Statement of Overriding Considerations was adopted for this project
No
(6) Findings were made pursuant to the provisions of CEQA
N/A

Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above. You may also contact the OPR via email at state.clearinghouse@opr.ca.gov or via phone at (916) 445-0613.

Download CSV New Search Print