La Habra Westridge Plaza
3 Documents in Project
Summary
SCH Number
2000031003
Lead Agency
City of La Habra
Document Title
La Habra Westridge Plaza
Document Type
NOD - Notice of Determination
Received
Posted
3/27/2003
Present Land Use
Existing Land Use- Chevron Petroleum Technology Center; Existing Zoning - PC-I (Planned Commercial-Industrial); General Plan Land Use Designation-Commercial Industrial.
Document Description
Minor modifications to the La Habra Westridge Plaza Site Plan approved by the City of La Habra in November 2000, consisting of: the addition of about 8,200 square feet of land adjacent to the approved project site for the expansion of the previously approved gas station to add one additional island (as modified, the gas station will contain a total of 6 pumps or 12 fueling positions), including the construction of a block retaining wall and wrought iron fence along the new property boundary shared with the golf course, the redesign of the existing golf cart drive and turnaround, the erection of a 22.5 foot net screen, and the recontour of the new interface between the existing golf course and the expansion area.
Contact Information
Name
Carlos Jaramillo
Agency Name
City of La Habra
Contact Types
Lead/Public Agency
Phone
Location
Cities
La Habra
Counties
Orange
Cross Streets
Beach Boulevard / Imperial Highway
Parcel #
019-182-08-12, 14-18, and 21
State Highways
SR-39 / SR-90 / SR-72
Waterways
Coyote Creek
Notice of Determination
Approving Agency
La Habra City Council
Approving Agency Role
Lead Agency
Approved On
Determinations
(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
Yes
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
No
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
N/A
(5) A Statement of Overriding Considerations was adopted for this project
No
(6) Findings were made pursuant to the provisions of CEQA
Yes
Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above.