Dublin Boulevard Widening Project

3 Documents in Project

Summary

SCH Number
2000022066
Lead Agency
City of Dublin
Document Title
Dublin Boulevard Widening Project
Document Type
NOD - Notice of Determination
Received
Posted
5/13/2002
Present Land Use
4-lane roadway, approximately 90 feet in width. Surrounding land uses include mixture of restaurant, commercial, retail, light industrial and office uses.
Document Description
The operator proposes the widening of the Dublin Boulevard bridge over Alamo Canal, an earthen bottom, trapezoidal flood control channel for Alamo Creek in Dublin, Alameda County. The project will require 20 new steel-concrete pilings be installed within the channel banks, however, only four of the pilings will be below the ordinary high water mark. The project will include reconstruction of three existing outfalls and installation of erosion control and bank stabilization consisting of quarter-ton rock slope protection. A retaining wall will be constructed in the banks on the east side to stabilize the unpaved service/recreational road at the top of the bank. The project is located on the Dublin Boulevard bridge over Alamo Creek in Dublin, Alameda County. CDFG is executing a Lake and Streambed Alteration Agreement Number R3-2001-1035 pursuant to Section 1601 of the Fish and Game Code to the project operator Ferdinand Del Rosario/ City of Dublin.

Contact Information

Name
Greg Martinelli
Agency Name
Department of Fish and Game
Contact Types
Lead/Public Agency

Location

Cities
Dublin
Counties
Alameda
Cross Streets
Dublin Boulevard/Village Parkway
State Highways
I-580 & I-680
Waterways
Alamo Creek

Notice of Determination

Approving Agency
Department of Fish and Game
Approving Agency Role
Responsible Agency
Approved On

Determinations

(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
Yes
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
N/A
(4) A mitigation reporting or monitoring plan was adopted for this project
N/A
(5) A Statement of Overriding Considerations was adopted for this project
N/A
(6) Findings were made pursuant to the provisions of CEQA
N/A