University of California, Irvine Medical Center Long Range Development Plan; UCIMC Long Range Development Plan

5 Documents in Project

Summary

SCH Number
2000021111
Lead Agency
Regents of the University of California
Document Title
University of California, Irvine Medical Center Long Range Development Plan; UCIMC Long Range Development Plan
Document Type
NOD - Notice of Determination
Received
Posted
1/17/2003
Present Land Use
UC Irvine Medical Center LRDP
Document Description
The proposed project is the adoption of the 2003 Long Range Development Plan (LRDP) for the UC Irvine Medical Center, and design approval for the Replacement Hospital within the UCIMC. The 2003 LRDP identified planning objectives, a development program, a physical planning framework to organize the site, planning zones to guide the siting of facilities, and establishes general design principles to guide the design of future facilities. The LRDP will allow for the phased reuse of the site with intensification of facilities. The LRDP proposes an overall increase of 991,684 gross square feet (gsf) of space (over the existing 910,365 gsf) for a total of 1,902,049 gsf by 2020. The campus also proposes to increase the number of beds by 136 over existing use of a total of 527 beds, or 69 above the existing 453 licensed beds. The proposed first project under the LRDP is the Replacement Hospital. The proposed replacement hospital is comprised of three main elements: the construction of a new hospital, renovation and non-structural SB 1953 bracing in Building 1A, the new chiller/ emergency generator plant and other utility upgrades. The proposed hospital would replace Building 1, and would provide 409,000 gsf of space to accommodate 191 beds, and 13 operating rooms, other diagnostic and treatment facilities, administrative and support services and other acute care functions. Shell space of 25,000 square feet would be constructed but left unfinished to enable the future addition of another 30-bed medical/ surgical unit when funding becomes available.

Contact Information

Name
Richard Demerjian
Agency Name
University of California, Irvine
Contact Types
Lead/Public Agency

Location

Cities
Orange
Counties
Orange
Cross Streets
City Dr./ Chapman Ave.
Total Acres
32
State Highways
I-5, SR-22
Railways
OCTA Metrolink
Waterways
Santa Ana River

Notice of Determination

Approving Agency
The Regents of the University of California
Approving Agency Role
Lead Agency
Approved On

Determinations

(1) The project will have a significant impact on the environment
Yes
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
Yes
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
No
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
N/A
(5) A Statement of Overriding Considerations was adopted for this project
Yes
(6) Findings were made pursuant to the provisions of CEQA
Yes

Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above. You may also contact the OPR via email at state.clearinghouse@opr.ca.gov or via phone at (916) 445-0613.

Download CSV New Search Print