Brown Rock Quarry Surface Mining Permit: APN 316-061-11 (Willow Creek area)

2 Documents in Project

Summary

SCH Number
2000012005
Lead Agency
Humboldt County
Document Title
Brown Rock Quarry Surface Mining Permit: APN 316-061-11 (Willow Creek area)
Document Type
NOD - Notice of Determination
Received
Posted
6/2/2000
Present Land Use
Timber Production Timber Production Zone Timber Production
Document Description
15-year renewal of a previously approved rock quarry surface mining permit. The project includes a Conditional Use Permit, Surface Mining Permit, Reclamation Plan, and review of financial assurance cost estimates for a surface mining operation involving an upland rock quarry with a proposed total extraction of 100,000 cubic yards over a 15-year period from an open pit mine. Two methods of surface rock removal will be used: 1) mass rock removal from the rockfields, and 2) selective removal of soil and rock generally from forested areas surrounding the rock fields. Equipment to be used includes a loader, cat and excavator. The operation will also involve boulder blasting, and material will be hauled by truck.

Contact Information

Name
Michael E. Wheeler
Agency Name
Humboldt County Planning Department
Contact Types
Lead/Public Agency

Location

Cities
Willow Creek
Counties
Humboldt
Cross Streets
South side of State Highway 299, approximately 3.0 miles west of Willow Creek
Zip
95573
Total Acres
9.0
Parcel #
316-061-11
State Highways
299
Waterways
Willow Creek
Township
6N
Range
4E
Section
1
Base
HM

Notice of Determination

Approving Agency
Humboldt County Board of Supervisors
Approving Agency Role
Lead Agency
Approved On

Determinations

(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
Yes
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
N/A
(5) A Statement of Overriding Considerations was adopted for this project
No
(6) Findings were made pursuant to the provisions of CEQA
Yes