Santa Monica High School Improvements Project

2 Documents in Project

Summary

SCH Number
2000011105
Lead Agency
Santa Monica-Malibu Unified School District
Document Title
Santa Monica High School Improvements Project
Document Type
NOD - Notice of Determination
Received
Posted
4/14/2000
Document Description
The proposed project includes the following new construction: an additional 12 standard-sized classrooms added to the existing language building (35,925 square feet) for an increase of 13,647 square feet; a 5,388 square foot addition to Barnum Hall; and an addition of 7,419 square feet in the existing 8,656 square-foot music building. A site plan is included as Figure 3. Other improvements include renovation of Barnum Hall; replacement of asphalt, sidewalk planter, and fencing; rebuild the baseball field complex; upgrade the drainage in the quad area; construct a retaining wall at the lower north and south art building courts; rework the gate opening and driveways; landscaping; rebuild the football field; Americans With Disability Act (ADA) improvements to existing building interiors.

Contact Information

Name
Teri Wissler
Agency Name
EMC Planning Group Inc.
Contact Types
Lead/Public Agency

Location

Cities
Santa Monica
Counties
Los Angeles
Cross Streets
601 Pico Boulevard
Total Acres
20
State Highways
10
Airports
Santa Monica Municipal
Waterways
Pacific Ocean
Other Location Info
Project is located at 601 Pico Boulevard, Santa Monica

Notice of Determination

Approving Agency
Santa Monica-Malibu Unified School District Board of Education
Approving Agency Role
Lead Agency
Approved On

Determinations

(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
Yes
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
N/A
(5) A Statement of Overriding Considerations was adopted for this project
No
(6) Findings were made pursuant to the provisions of CEQA
N/A

Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above. You may also contact the OPR via email at state.clearinghouse@opr.ca.gov or via phone at (916) 445-0613.