Lower Owen River Plan
14 Documents in Project
Summary
SCH Number
2000011075
Lead Agency
City of Los Angeles
Document Title
Lower Owen River Plan
Document Type
NOD - Notice of Determination
Received
Posted
9/5/2008
Present Land Use
Various
Document Description
CDFG is executing a Lake and Streambed Alteration Agreement pursuant to Section 1602 (SAA #1600-2007-0181-R6) of the Fish and Game Code to the project Applicant, City of Los Angeles. The Applicant proposed to conduct the removal of beaver dams on the Lower Owns River, and the removal of accumulated sediments as necessary to accurately operate existing measuring stations by impeding flow; negatively affect the maintenance or expansion of riparian habitats; cause the Applicant to release additional amounts of water to maintain 40cfs at following measuring stations; or otherwise impact ecosystem health.
Contact Information
Name
Brad Henderson
Agency Name
California Department of Fish and Game
Contact Types
Lead/Public Agency
Phone
Location
Counties
Inyo
Cross Streets
Various
Zip
Various
Parcel #
Various
State Highways
Hwy 395 and 136
Railways
Historical, not operational
Airports
Lone Pine
Schools
Various
Waterways
Owens River and Owen Lake
Township
Vari.
Range
Vari.
Section
Vari.
Base
SBB&M
Other Location Info
Project area includes 62 river miles of the Lower Owens River and the Ownes River Delta and areas adjacent to the river.
Other Information
Project extends along 62 miles of river
Notice of Determination
Approving Agency
California Department of Fish and Game
Approving Agency Role
Responsible Agency
Approved On
Determinations
(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
Yes
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
No
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
N/A
(5) A Statement of Overriding Considerations was adopted for this project
No
(6) Findings were made pursuant to the provisions of CEQA
Yes
Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above.