Lower Owen River Plan

14 Documents in Project

Summary

SCH Number
2000011075
Lead Agency
Los Angeles, City of (City of Los Angeles)
Document Title
Lower Owen River Plan
Document Type
NOD - Notice of Determination
Received
Posted
9/5/2008
Present Land Use
Various

Document Description
CDFG is executing a Lake and Streambed Alteration Agreement pursuant to Section 1602 (SAA #1600-2007-0181-R6) of the Fish and Game Code to the project Applicant, City of Los Angeles. The Applicant proposed to conduct the removal of beaver dams on the Lower Owns River, and the removal of accumulated sediments as necessary to accurately operate existing measuring stations by impeding flow; negatively affect the maintenance or expansion of riparian habitats; cause the Applicant to release additional amounts of water to maintain 40cfs at following measuring stations; or otherwise impact ecosystem health.

Contact Information
Brad Henderson
California Department of Fish and Game
407 W. Line Street
Bishop, CA 93514

Phone : (760) 873-4412

Location

Counties
Inyo
Cross Streets
Various
Zip
Various
Parcel #
Various
State Highways
Hwy 395 and 136
Railways
Historical, not operational
Airports
Lone Pine
Schools
Various
Waterways
Owens River and Owen Lake
Township
Vari.
Range
Vari.
Section
Vari.
Base
SBB&M
Other Location Info
Project area includes 62 river miles of the Lower Owens River and the Ownes River Delta and areas adjacent to the river.
Other Information
Project extends along 62 miles of river

Notice of Determination

Approving Agency
California Department of Fish and Game
Approving Agency Role
Responsible Agency
Approved On
Final Environmental Document Available at
N/A

Determinations

(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
Yes
(2b) A Negative Declaration was prepared for this project pursuant to the provisions of CEQA
No
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
N/A
(5) A Statement of Overriding Considerations was adopted for this project
No
(6) Findings were made pursuant to the provisions of CEQA
Yes
Download CSV New Search