Applications to Appropriate Water No. 30490 & 30491

2 Documents in Project

Summary

SCH Number
1999122097
Lead Agency
State Water Resources Control Board
Document Title
Applications to Appropriate Water No. 30490 & 30491
Document Type
NOD - Notice of Determination
Received
Posted
8/7/2000
Present Land Use
Agricultural Watershed
Document Description
Both applications use the same Points of Diversion (PODs) and serve the same Place of Use, 40 acres of vineyard (34 planted). The dam at POD#1 forms an onstream reservoir (built 1972; approx. 49 acre-ft.) on one of the unnamed streams. At POD#2, water is diverted from an Unnamed Stream channel into an artificial earthen channel through a 12-in-diameter culvert approximately 800 ft. long with a capacity of 2.99 cubic-ft./second. Application 30490 requests diversion to storage of up to 49 acre-ft. per annum, collected from both POD#1 and POD#2 between Dec. 15 and Mar. 31. The Purpose of Use of stored water include frost protection, heat control, stock watering, fire protection, irrigation, and incidental recreation. Application 30491 requests direct diversion of up to 35 acre-ft. per annum between Mar. 1-31 for frost protection. POD#2 is on an Unnamed Stream that, in its lower reaches near the Napa River, supports steelhead trout (Oncorhynchus mykiss).

Contact Information

Name
Joan Jurancich
Agency Name
State Water Resources Control Board, Division of Water Rights
Contact Types
Lead/Public Agency

Location

Cities
Saint Helena
Counties
Napa
Cross Streets
Taplin Road and Silverado Trail
Total Acres
40
Parcel #
25-180-13
State Highways
128
Waterways
Napa River
Township
8N
Range
5W
Section
33
Base
MDB&M

Notice of Determination

Approving Agency
State Water Resources Control Board
Approving Agency Role
Lead Agency
Approved On

Determinations

(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
Yes
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
N/A
(5) A Statement of Overriding Considerations was adopted for this project
N/A
(6) Findings were made pursuant to the provisions of CEQA
N/A

Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above.

Download CSV New Search Print