Apalachee 3B Erosion Control Project (JN 95183)
7 Documents in Project
Download CSV
New Search
Print
Summary
- SCH Number
- 1999122015
- Lead Agency
- El Dorado County
- Document Title
- Apalachee 3B Erosion Control Project (JN 95183)
- Document Type
- NOD - Notice of Determination
- Received
- Posted
- 11/30/2007
- Document Description
- El Dorado County proposes to construct and maintain storm water facilities and implement erosion control practices in the Tahoe Paradise subdivision 1-8, as identified in the Lake Tahoe Environmental Improvement Program. The objectives are to improve water quality by reducing erosion problems identified in the project area and by treating roadway run-off. The addendum was prepared to include additional public parcels and minor design modifications.
- Contact Information
-
Alfred Knotts
El Dorado County DOT
924 B Emerald Bay Road
South Lake Tahoe, CA 96150
Phone : (530) 573-7921
Location
- Cities
- South Lake Tahoe
- Counties
- El Dorado
- Cross Streets
- Pioneer Trial between Jicarilla and Glen Eagles
- Total Acres
- 500+/-
- Airports
- Lake Tahoe Airport
- Schools
- Sierra House Elementary
- Waterways
- Upper Truckee River, Trout Creek
- Township
- 12N
- Range
- 18E
- Section
- 15,16
- Base
- MDM
- Other Information
- Section 21
Notice of Determination
- Approving Agency
- El Dorado County
- Approving Agency Role
- Lead Agency
- Approved On
- Final Environmental Document Available at
- El Dorado County DOT
Determinations
- (1) The project will have a significant impact on the environment
- No
- (2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
- No
- (2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
- Yes
- (2c) An other document type was prepared for this project pursuant to the provisions of CEQA
- No
- (3) Mitigated measures were made a condition of the approval of the project
- Yes
- (4) A mitigation reporting or monitoring plan was adopted for this project
- N/A
- (5) A Statement of Overriding Considerations was adopted for this project
- No
- (6) Findings were made pursuant to the provisions of CEQA
- Yes
Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above. You may also contact the OPR via email at state.clearinghouse@opr.ca.gov or via phone at (916) 445-0613.