California State University, Channel Islands, Revised Campus Master Plan; California State University, Channel Islands Campus Master Plan
16 Documents in Project
Summary
SCH Number
1999121111
Lead Agency
California State University, Channel Islands
(CSUCI)
Document Title
California State University, Channel Islands, Revised Campus Master Plan; California State University, Channel Islands Campus Master Plan
Document Type
NOD - Notice of Determination
Received
Posted
3/13/2003
Document Description
The project will be a multi-story complex that will provide a minimum of 351 beds located in a combination of 86 four single person bedroom style apartments with a common kitchen and living area in each apartment and a minimum of seven studio apartments for resident assistants. Project components include the student housing complex, site development, landscaping, site lighting/signage and approximately 230 parking spaces. The design of the buildings will conform to the existing Mission/ Spanish revival style architecture on the campus with appropriate lighting on the grounds and in the buildings to promote a safe environment. The project is compliant with American with Disabilities Act. All fire alarm systems will be compatible with current campus standards and will meet campus fire marshal regulations.
Contact Information
Name
George Dutra
Agency Name
Trustees of the California State University
Contact Types
Lead/Public Agency
Phone
Location
Cities
Camarillo
Counties
Ventura
Total Acres
634
State Highways
101
Notice of Determination
Approving Agency
Board of Trustees of the California State University
Approving Agency Role
Lead Agency
Approved On
Determinations
(1) The project will have a significant impact on the environment
Yes
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
Yes
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
No
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
N/A
(5) A Statement of Overriding Considerations was adopted for this project
Yes
(6) Findings were made pursuant to the provisions of CEQA
Yes
Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above.