Louisiana-Pacific Corporation Conditional Use Permit/Coastal Development Permit
2 Documents in Project
Summary
SCH Number
1999112078
Lead Agency
Humboldt County
Document Title
Louisiana-Pacific Corporation Conditional Use Permit/Coastal Development Permit
Document Type
NOD - Notice of Determination
Received
Posted
2/25/2000
Present Land Use
Present Land Use: Industrial - Existing Pulp Mill
Present Zoning: Coastal Dependent Industrial
Present General Plan: Coastal Dependent Industrial
Document Description
A Coastal Development Permit and Conditional Use Permit for improvements within the existing L-P pulp mill facility. The project is a "Bleaching Modernization Project" involving the following upgrades: 1) addition of a second stage oxygen delignification reactor 50 feet in height and 8 feet in diameter; 2) addition of two additional pulp washers similar in size and dimension to the existing pulp washers; 3) addition of a pressurized hydrogen peroxide stage either through retrofit of an existing bleach tower or addition of a new tank 10 to 12 feet in diameter and 30 to 40 feet in height; and 4) replacement of the pulp cleaning system with new machinery of a more modern design all to be located within the existing pulp machine building. The project will not result in an increase in the permitted capacity of the mill, and all improvements will be located within areas already developed with industrial uses.
Contact Information
Name
Michael Wheeler, Senior Planner
Agency Name
Planning Division of Humbolt County Community Dev. Services
Contact Types
Lead/Public Agency
Phone
Location
Cities
Eureka
Counties
Humboldt
Cross Streets
New Navy Base Road/Cookhouse Road
Zip
95564
Parcel #
401-112-07
State Highways
101
Railways
Northwest Pacific
Schools
Peninsula Union School
Waterways
Humboldt Bay
Township
5N
Range
1W
Section
29
Base
HM
Notice of Determination
Approving Agency
Humboldt County Planning Commission
Approving Agency Role
Lead Agency
Approved On
Determinations
(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
Yes
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
N/A
(5) A Statement of Overriding Considerations was adopted for this project
No
(6) Findings were made pursuant to the provisions of CEQA
Yes
Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above.