GTE/ Celluar One Transmission Facility

3 Documents in Project

Summary

SCH Number
1999112072
Lead Agency
City of Napa
Document Title
GTE/ Celluar One Transmission Facility
Document Type
NOD - Notice of Determination
Received
Posted
10/10/2001
Present Land Use
Single family residential general plan agricultural resources; hillside overlay; erosion control overlay; agricultural buffer overlay.
Document Description
Construct two - 35 foot simulated tree poles to support telecommunications equipment. The tree poles will replace and require removal of an existing 61 foot monopole and 49 foot 3-pole structure currently supporting equipment for Verizon and AT&T on the site. The new tree poles will be located about 35-45 feet east of the existing 3 pole structure and use existing equipment buildings and driveway access. Power will be undergrounded from the nearby existing facilities and additional landscaping provided to help screen the poles.

Contact Information

Name
Jean Hasser, Senior Planner
Agency Name
City of Napa Community Services Department
Contact Types
Lead/Public Agency

Location

Cities
Napa
Counties
Napa
Cross Streets
Thompson Avenue and Old Sonoma Road
Total Acres
5.37
Parcel #
50-270-19
State Highways
29, 12/121
Railways
Napa Valley Wine Train
Waterways
Napa River
Township
16
Range
5N
Section
4W

Notice of Determination

Approving Agency
City of Napa
Approving Agency Role
Lead Agency
Approved On

Determinations

(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
Yes
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
No
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
N/A
(5) A Statement of Overriding Considerations was adopted for this project
No
(6) Findings were made pursuant to the provisions of CEQA
Yes

Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above. You may also contact the OPR via email at state.clearinghouse@opr.ca.gov or via phone at (916) 445-0613.

Download CSV New Search Print