Fresno Metropolitan Flood Control District (District), Fresno Stormwater Collection, Treatment and Surface Water Recycling Project (Project), CWSRF Project No.

10 Documents in Project

Summary

SCH Number
1999111132
Lead Agency
Fresno Metropolitan Flood Control District
Document Title
Fresno Metropolitan Flood Control District (District), Fresno Stormwater Collection, Treatment and Surface Water Recycling Project (Project), CWSRF Project No.
Document Type
NOD - Notice of Determination
Received
Posted
9/21/2009
Document Description
The Project consists of 16 project elements at 16 sites within the City of Fresno. Construction of essential stormwater conveyance and recycling facilities in Fresno's urban core will: 1) address public safety and environmental problem caused by local flooding and lost opportunities for groundwater recharge; 2) eliminate connectivity between sanitary sewer and storm sewer systems to reduce inputs to the regional sewer treatment plant; 3) treat collected surface water prior to infiltration to the regional aquifer; and 4) recycle non-potable surface water for landscape irrigation to save municipal potable water for higher uses.

Contact Information

Name
Mark Fong
Agency Name
State Water Resources Control Board
Contact Types
Lead/Public Agency

Location

Cities
Clovis, Fresno
Counties
Fresno
Cross Streets
Cities of Fresno and Clovis
Parcel #
Multiple
State Highways
Hwy 99, 41, 180, 168
Airports
Fresno International
Waterways
San Joaquin River

Notice of Determination

Approving Agency
State Water Resources Control Board, Div. Financ. Assist.
Approving Agency Role
Responsible Agency
Approved On

Determinations

(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
Yes
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
No
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
N/A
(5) A Statement of Overriding Considerations was adopted for this project
N/A
(6) Findings were made pursuant to the provisions of CEQA
Yes

Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above. You may also contact the OPR via email at state.clearinghouse@opr.ca.gov or via phone at (916) 445-0613.

Download CSV New Search Print