Subsequent Project: Basin "CF" Groundwater Recharge and Flood Control Project
10 Documents in Project
Download CSV
Download All Attachments
New Search
Print
Summary
- SCH Number
- 1999111132
- Lead Agency
- Fresno Metropolitan Flood Control District
- Document Title
- Subsequent Project: Basin "CF" Groundwater Recharge and Flood Control Project
- Document Type
- NOD - Notice of Determination
- Received
- Posted
- 11/19/2020
- Present Land Use
- stormwater basin, agricultural, commercial, does not change existing land uses.
- Document Description
- The Project is a subsequent project identified and studied in the 2016 District Services Plan Update Subsequent EIR certified on December 13, 2017. The project includes constructing a pump station at an existing District stormwater basin, internal basin pipelines, a relief connection pipeline and intertie structure to the Fresno Irrigation District Washington Colony Canal. The District has prepared an Initial Study for the project and has determined that the project would not result in any additional significant environmental effect not previously analyzed in the Subsequent EIR and Master EIR. No new additional mitigation measures or alternatives are required.
- Contact Information
-
Joseph Draper
Fresno Metropolitan Flood Control District
Lead/Public Agency
4569 East Olive Ave
Fresno, CA 93727
Phone : (559) 456-3292
josephd@fresnofloodcontrol.org -
Fresno Metropolitan Flood Control District
Project Applicant
Location
- Cities
- Fresno
- Counties
- Fresno
- Cross Streets
- Central Ave and Peach Ave
- Zip
- 93725
- State Highways
- 99
- Railways
- Union Pacific
- Schools
- Malaga Elementary
- Waterways
- Washington Colony Canal
- Township
- 14S
- Range
- 21E
- Section
- 21
Notice of Determination
- Approving Agency
- Fresno Metropolitan Flood Control District
- Approving Agency Role
- Lead Agency
- Approved On
- Final Environmental Document Available at
- FMFCD Offices 5469 East Olive Ave Fresno, CA 93727
Determinations
- (1) The project will have a significant impact on the environment
- No
- (2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
- Yes
- (2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
- No
- (2c) An other document type was prepared for this project pursuant to the provisions of CEQA
- No
- (3) Mitigated measures were made a condition of the approval of the project
- Yes
- (4) A mitigation reporting or monitoring plan was adopted for this project
- Yes
- (5) A Statement of Overriding Considerations was adopted for this project
- No
- (6) Findings were made pursuant to the provisions of CEQA
- Yes
Attachments
- Environmental Document
- Notice & Initial Study PDF 1787 K
- Notice of Determination
- NOD Final PDF 789 K
Disclaimer: The Governor’s Office of Planning and Research (OPR) accepts no responsibility for the content or accessibility of these documents. To obtain an attachment in a different format, please contact the lead agency at the contact information listed above. You may also contact the OPR via email at state.clearinghouse@opr.ca.gov or via phone at (916) 445-0613. For more information, please visit OPR’s Accessibility Site.