Subsequent Project: Basin "CF" Groundwater Recharge and Flood Control Project

10 Documents in Project

Summary

SCH Number
1999111132
Lead Agency
Fresno Metropolitan Flood Control District
Document Title
Subsequent Project: Basin "CF" Groundwater Recharge and Flood Control Project
Document Type
NOD - Notice of Determination
Received
Posted
11/19/2020
Present Land Use
stormwater basin, agricultural, commercial, does not change existing land uses.
Document Description
The Project is a subsequent project identified and studied in the 2016 District Services Plan Update Subsequent EIR certified on December 13, 2017. The project includes constructing a pump station at an existing District stormwater basin, internal basin pipelines, a relief connection pipeline and intertie structure to the Fresno Irrigation District Washington Colony Canal. The District has prepared an Initial Study for the project and has determined that the project would not result in any additional significant environmental effect not previously analyzed in the Subsequent EIR and Master EIR. No new additional mitigation measures or alternatives are required.

Contact Information

Name
Joseph Draper
Agency Name
Fresno Metropolitan Flood Control District
Contact Types
Lead/Public Agency

Name
Agency Name
Fresno Metropolitan Flood Control District
Contact Types
Project Applicant

Location

Cities
Fresno
Counties
Fresno
Cross Streets
Central Ave and Peach Ave
Zip
93725
State Highways
99
Railways
Union Pacific
Schools
Malaga Elementary
Waterways
Washington Colony Canal
Township
14S
Range
21E
Section
21

Notice of Determination

Approving Agency
Fresno Metropolitan Flood Control District
Approving Agency Role
Lead Agency
Approved On

Determinations

(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
Yes
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
No
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
Yes
(5) A Statement of Overriding Considerations was adopted for this project
No
(6) Findings were made pursuant to the provisions of CEQA
Yes

Attachments

Notice of Determination

Disclaimer: The Governor’s Office of Planning and Research (OPR) accepts no responsibility for the content or accessibility of these documents. To obtain an attachment in a different format, please contact the lead agency at the contact information listed above. You may also contact the OPR via email at state.clearinghouse@opr.ca.gov or via phone at (916) 445-0613. For more information, please visit OPR’s Accessibility Site.

Download CSV Download All Attachments New Search Print