La Paloma Generating Project

4 Documents in Project

Summary

SCH Number
1999109063
Lead Agency
California Energy Commission
Document Title
La Paloma Generating Project
Document Type
NOD - Notice of Determination
Received
Posted
10/12/2004
Document Description
Clarify the definition of "startup" for consistency with vendor recommendations for turbine and operational efficiency; clarify the definition of "shutdown" to allow for aborted protective load shedding scenarios; allow for SCR ammonia injection at lower temperatures; increase the one-hour NOx limit from 160 lb/hr to 400 lb/hr to allow for all four turbines to startup in the same time frame; specify the cooling tower drift calculation factor of 0.5 for consistency with the San Joaquin Valley Air Pollution Control District's revised Permit to Operate; reduce the frequency of sampling the cooling tower total dissolved solids from weekly to quarterly, and revise the descriptions of the emergency deisel engines to reflect the equipment installed on site.

Contact Information

Name
Nancy Tronaas
Agency Name
California Energy Commission
Contact Types
Lead/Public Agency

Location

Cities
McKittrick
Counties
Kern

Notice of Determination

Approving Agency
California Energy Commission
Approving Agency Role
Lead Agency
Approved On

Determinations

(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
No
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
N/A
(5) A Statement of Overriding Considerations was adopted for this project
No
(6) Findings were made pursuant to the provisions of CEQA
N/A

Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above.

Download CSV New Search Print