City of Santa Cruz Routine Maintenance Activities

5 Documents in Project

Summary

SCH Number
1999102083
Lead Agency
Santa Cruz, City of (City of Santa Cruz)
Document Title
City of Santa Cruz Routine Maintenance Activities
Document Type
NOD - Notice of Determination
Received

Document Description
The project sites are for routine maintenance activities located on multiple stream channels, drainages and waterways within the city limits of the City of Santa Cruz. 'Maintenance' refers to generally limited tasks that occur repeatedly over time and are necessary to maintain and preserve facilities and amenities in good condition. Maintenance activities include , but are not necessarily limited to the following: repairs, replacement, and cleaning of existing facilities and infrastructure (such as roads, trails and culverts); installation of minor new structures or infrastructure undertaken to improve an existing road, trail or facility activities such as minor grading, sediment removal or vegetation control to correct conditions that threaten or degrade natural environments (such as non-native plant species control, removal of trash from channels or drainage and erosion repairs, and habitat enhancement). Portions of this project were analyzed previously in the Negative Declaration and Supplemental Negative Declaration. The California Department of Fish and Wildlife is executing a Lake and Streambed Alteration Agreement Number 1600-2013-0176 pursuant to Section 1602 of the Fish and Game Code to the project Applicant, Mark Dettle/City of Santa Cruz Department of Public Works.

Contact Information
Melissa Farinha
CDFW Bay Delta Region
7329 Silverado Trail
Napa, CA 94558

707-944-5579

Location

Cities
Santa Cruz
Counties
Santa Cruz
Cross Streets
Hubbard / Ocean
Zip
95060
State Highways
1
Waterways
Branciforte Creek/San Lorenzo River

Notice of Determination

Approving Agency
CDFW
Approving Agency Role
Responsible Agency
Approved On
Final EIR Available Location
City of Santa Cruz, 809 Center Street, Santa Cruz, CA 95060 Juliana Rebagliati, (831) 420-6254

Determinations

(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Negative Declaration was prepared for this project pursuant to the provisions of CEQA
Yes
(3) Mitigated measures were made a condition of the approval of the project
N/A
(4) A Statement of Overriding Considerations was adopted for this project
N/A
(5) Findings were made pursuant to the provisions of CEQA
N/A
Download CSV New Search