Integrated Vector Management Program
2 Documents in Project
Summary
SCH Number
1999102022
Lead Agency
Marin-Sonoma Mosquito and Vector Control District
Document Title
Integrated Vector Management Program
Document Type
NOD - Notice of Determination
Received
Posted
7/19/2004
Document Description
The Integrated Vector Management Program of the Marin/Sonoma Mosquito and Vector Control District is a long-standing, ongoing program of surveillance and control of mosquitoes and other vectors of human disease and discomfort. The program consists of six types of activities: 1) Surveillance for vector populations, vector habitats, disease pathogens, and public distress associated with vectors; 2) Public Education to encourage and assist reduction or prevention of vector habitats on private and public property; 3) Management of vector habitat, especially through water control and maintenance or improvement of channels, tide gates, levees, and other water control facilities, etc. ("Physical Control"); 4) Applications of herbicides and other forms of Vegetation Management to improve surveillance or reduce vector populations; 5) Rearing, stocking, and provision to the public of the "mosquito fish"; application of the bacterium or fungus; and possibly use of other predators or pathogens of vectors ("Biological Control"); 6) Application of non-persistent selective insecticides to reduce populations of larval or adult mosquito and other invertebrate threats to public health, and rodenticides to control rats ("Chemical Control").
Contact Information
Name
Ronald Keith
Agency Name
Marin / Sonoma Mosq. & Vector Control District
Contact Types
Lead/Public Agency
Phone
Location
Counties
Marin, Sonoma
Notice of Determination
Approving Agency
Marin/Sonoma Mosquito & Vector Management Program
Approving Agency Role
Lead Agency
Approved On
Determinations
(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
Yes
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
N/A
(5) A Statement of Overriding Considerations was adopted for this project
No
(6) Findings were made pursuant to the provisions of CEQA
Yes
Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above.