California Forest Highway Project 129 , Arroyo Seco Road Bridge Replacement

2 Documents in Project

Summary

SCH Number
1999101096
Lead Agency
Monterey County
Document Title
California Forest Highway Project 129 , Arroyo Seco Road Bridge Replacement
Document Type
NOD - Notice of Determination
Received
Posted
1/26/2000
Present Land Use
The project involves the replacment of two existing bridges located on a County Road facility. No change of land use is involved. The Zoning and General Plan depict the project area as a transportation facility.
Document Description
The Federal Highway Administration [ FHWA ], as lead agency in cooperation with the Los Padres National Forest, is proposing to replace two bridges on Arroyo Seco Road (County Road G17). This five-mile route follows the general direction of the Arroyo Seco River in Monterey County. It begins at the intersection with Carmel Valley Road (County Road G17) and ends 0.3 miles west of the Arroyo Seco River crossing in the USFS Arroyo Seco Recreation Complex. The bridges will be replaced in approximately the same locations as the existing bridges. Both bridges are designed to the California standard width of 32 feet with an additional 4 feet for sidewalks. The new bridges are designed to pass a 100-year flood event. The road will be kept open and access will be maintained at both sites during construction.

Contact Information

Name
G.H. Nichols
Agency Name
Monterey County Public Works Department
Contact Types
Lead/Public Agency

Location

Cities
Greenfield, Salinas
Counties
Monterey
Cross Streets
Arroyo Seco Road, ( County Road G17 )
State Highways
U.S. 101
Waterways
Arroyo Seco River and Piney Creek

Notice of Determination

Approving Agency
Monterey County Board of Supervisors
Approving Agency Role
Lead Agency
Approved On

Determinations

(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
Yes
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
N/A
(5) A Statement of Overriding Considerations was adopted for this project
No
(6) Findings were made pursuant to the provisions of CEQA
Yes

Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above. You may also contact the OPR via email at state.clearinghouse@opr.ca.gov or via phone at (916) 445-0613.