Grand Central Recycling and Transfer Station, Amendment to CUP 99-2;
12 Documents in Project
Summary
SCH Number
1999101001
Lead Agency
City of Industry
Document Title
Grand Central Recycling and Transfer Station, Amendment to CUP 99-2;
Document Type
NOD - Notice of Determination
Received
Posted
7/14/2004
Present Land Use
Land Use: Industrial / Zoning: M / General Plan: Industrial
Document Description
Changed in name from Industry Urban-Development Agency to Grand Central Recycling and Transfer Station, Inc. Increase maximum permitted tons of waste to be received per operating day from 1,500 tons to 5,000 tons, site acreage will increase from 10 acres to 10.26 acres and number of load checks per day will increase to five load checks per day. Addition of four permit conditions: Condition 17.1 was added which states that the facility shall comply will all SMS for solid waste handling and disposal. Condition 17.2 requires the operator to comply with all local requirements and enactments. Condition 17.4 requires the owner/operator to notify the LEA of any plans to encumber, sell, transfer or convey the operation or ownership to a new operator or owner at least 45 days prior to the anticipated transfer. Condition 17.10 states that the LEA reserves the right to require the operator to provide more stringent dust and odor control measures. Limit peak traffic to 894 vehicles per day.
Contact Information
Name
William Marciniak
Agency Name
California Integrated Waste Management Board
Contact Types
Lead/Public Agency
Phone
Location
Cities
Industry
Counties
Los Angeles
Cross Streets
South Hatcher Avenue and Chestnut Street
Zip
91744
Total Acres
10.26
State Highways
State Route 60
Railways
Union Pacific Railroad
Schools
Hurley Elementary Station, City of La Puente
Waterways
San Jose Creek Flood Control Channel
Notice of Determination
Approving Agency
California Integrated Waste Management Board
Approving Agency Role
Responsible Agency
Approved On
Determinations
(1) The project will have a significant impact on the environment
Yes
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
Yes
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
No
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
N/A
(5) A Statement of Overriding Considerations was adopted for this project
Yes
(6) Findings were made pursuant to the provisions of CEQA
N/A
Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above.