Salton Sea Channel Connection/Cleaning (Lake or Streambed Alteration Agreement No. 1600-2015-0081-R6)

18 Documents in Project

Summary

SCH Number
1999091142
Lead Agency
Imperial Irrigation District
Document Title
Salton Sea Channel Connection/Cleaning (Lake or Streambed Alteration Agreement No. 1600-2015-0081-R6)
Document Type
NOD - Notice of Determination
Received
Posted
9/30/2015
Present Land Use
All lands are presently agricultural lands. Zoning: Agricultural uses General Plan: Agriculture
Document Description
CDFW has executed lake and streambed alteration agreement no. 1600-2015-0081-R6, pursuant to section 1602 of the fish and game code to the project applicant, the Imperial Irrigation District. The project is limited to the rehabilitation of an existing earthen ramp to access the project site, clearing of vegetation on the project site, transporting and depositing on site sediment removed from the nearby Fudge Reservoir, drying of deposited sediment, and spreading the sediment through the use of bulldozers or graders to make a flat surface. The purpose of the project is to prepare and utilize a site for the reception of sediment removed from the Fudge Reservoir. Project activities will result in a total of 15.53 acres of permanent impacts to vegetated streambed.

Contact Information

Name
Charles Land
Agency Name
CDFW Inland Deserts Region 6
Contact Types
Lead/Public Agency

Location

Counties
Imperial, Riverside, San Diego
State Highways
Hwy 86, 111, 98, 78
Waterways
Salton Sea, New River, Alamo River
Other Location Info
Brawley

Notice of Determination

Approving Agency
CDFW
Approving Agency Role
Responsible Agency
Approved On

Determinations

(1) The project will have a significant impact on the environment
Yes
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
Yes
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
No
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
N/A
(5) A Statement of Overriding Considerations was adopted for this project
No
(6) Findings were made pursuant to the provisions of CEQA
Yes

Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above. You may also contact the OPR via email at state.clearinghouse@opr.ca.gov or via phone at (916) 445-0613.