Salton Sea Channel Connection/Cleaning (Lake or Streambed Alteration Agreement No. 1600-2015-0082-R6)

15 Documents in Project

Summary

SCH Number
1999091142
Lead Agency
Imperial Irrigation District
Document Title
Salton Sea Channel Connection/Cleaning (Lake or Streambed Alteration Agreement No. 1600-2015-0082-R6)
Document Type
NOD - Notice of Determination
Received
Posted
9/30/2015
Present Land Use
All lands are presently agricultural lands. Zoning: Agricultural uses General Plan: Agriculture

Document Description
CDFW has executed lake and streambed alteration agreement no. 1600-2015-0082-R6, pursuant to section 1602 of the fish and game code to the project applicant, the Imperial Irrigation District. The project is limited to the cleaning/clearing through excavation of accumulated sediment and barnacles from the mouths of two channels that connect to the Salton Sea. Excavation will be performed by an excavator sitting on top of the bank of each channel. Project activities will result in a total of 1.5 acres of permanent impacts to streambed.

Contact Information
Charles Land
CDFW Inland Deserts Region 6
Lead/Public Agency
3602 Inland Empire Boulevard, Suite C-220
Ontario, CA 91764

Phone : (760) 200-9418

Location

Counties
Imperial Riverside San Diego
State Highways
Hwy 86, 111, 98, 78
Waterways
Salton Sea, New River, Alamo River
Other Location Info
Desert Shores

Notice of Determination

Approving Agency
CDFW
Approving Agency Role
Responsible Agency
Approved On
Final Environmental Document Available at
3602 Inland Empire Blvd, Suite C-220, Ontario, CA 91764

Determinations

(1) The project will have a significant impact on the environment
Yes
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
Yes
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
No
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
N/A
(5) A Statement of Overriding Considerations was adopted for this project
No
(6) Findings were made pursuant to the provisions of CEQA
Yes

Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above. You may also contact the OPR via email at state.clearinghouse@opr.ca.gov or via phone at (916) 445-0613.

Download CSV New Search Print