Alamo River - Garst Rd Crossing: Vegetation Removal

18 Documents in Project

Summary

SCH Number
1999091142
Lead Agency
Imperial Irrigation District
Document Title
Alamo River - Garst Rd Crossing: Vegetation Removal
Document Type
NOD - Notice of Determination
Received
Posted
9/17/2014
Present Land Use
All lands are presently agricultural lands. Zoning: Agricultural uses General Plan: Agriculture
Document Description
CDFW is executing a Lake and Streambed Alteration Agreement (SAA # 1600-2014-0066-R6) pursuant to Section 1602 of the Fish and Game Code to the project Applicant, Imperial Irrigation District, represented by Ms. Jessica Lovecchio, 333 E. Barioni Boulevard, City of Imperial, State of California, 92251, Phone (760) 339-9703. The Applicant is proposing to remove approximately 250 linear feet of vegetation from both banks of the Alamo River from the Garst Road Bridge over the Alamo River eastward to the United States Geological Survey (USGS) monitoring station. The purpose of the project is to improve measurement quality of the measurements recorded from the USGS monitoring station. Vegetation will be removed by excavator filled with a "claw" attachment working from dirt access roads located on top of the banks of the Alamo River. Removed vegetation will be piled along the side of the roads that are away from the river. A total of 0.57 acres of temporary impacts to jurisdictional streambed will result from the cosntruction activities.

Contact Information

Name
Charles Land
Agency Name
CDFW Inland Deserts Region 6
Contact Types
Lead/Public Agency

Location

Cities
Brawley, Calipatria, El Centro, Imperial Beach
Counties
Imperial, Riverside, San Diego
State Highways
Hwy 86, 111, 98, 78
Waterways
Salton Sea, New River, Alamo River
Other Location Info
City/Nearest Community: Niland

Notice of Determination

Approving Agency
CDFW
Approving Agency Role
Responsible Agency
Approved On

Determinations

(1) The project will have a significant impact on the environment
Yes
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
Yes
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
No
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
N/A
(5) A Statement of Overriding Considerations was adopted for this project
Yes
(6) Findings were made pursuant to the provisions of CEQA
Yes

Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above. You may also contact the OPR via email at state.clearinghouse@opr.ca.gov or via phone at (916) 445-0613.

Download CSV New Search Print