Seacliff Promenade Conceptual Master Plan, Palm/Goldenwest Specific Plan

2 Documents in Project

Summary

SCH Number
1999091078
Lead Agency
City of Huntington Beach
Document Title
Seacliff Promenade Conceptual Master Plan, Palm/Goldenwest Specific Plan
Document Type
NOD - Notice of Determination
Received
Posted
5/16/2012
Present Land Use
Zoning: IG-O-CZ and IG-OI-CZ (general industrial with oil use overlay within Coastal Zone), RH-O-CZ (high density residential with oil use overlay, within Coastal Zone, CG-O-CZ (general commercial with oil use overlay, within Coastal Zone) General Plan: 1985 Coastal Element: Medium Density Residential, Resource Production with Visitor Serving Commercial Overlay 1996 General Plan: MH-F2/30 (Avg. 15)-sp
Document Description
Project proposes activities necessary to directionally drill one oil and gas producer well on an existing pad within the active Huntington Beach oil field with the well bottom hole located offshore. The project is covered under the 2000 Palm/Goldenwest Specific Plan and its initial study/mitigated negative declaration.

Contact Information

Name
Jan Perez
Agency Name
California Division of Oil, Gas and Geothermal Resources
Contact Types
Lead/Public Agency

Location

Cities
Huntington Beach
Counties
Orange
Cross Streets
Palm Avenue and Goldenwest Street
Zip
92648
Total Acres
150
Parcel #
023-181-53,54 & 55
State Highways
1
Schools
Seacliff Elementary
Waterways
Pacific Ocean
Township
6
Range
11
Section
3,4,10

Notice of Determination

Approving Agency
California Division of Oil, Gas, Geothermal Resources
Approving Agency Role
Responsible Agency
Approved On

Determinations

(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
Yes
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
N/A
(5) A Statement of Overriding Considerations was adopted for this project
No
(6) Findings were made pursuant to the provisions of CEQA
Yes

Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above.

Download CSV New Search Print