Regional Water Facilities Master Plan

8 Documents in Project

Summary

SCH Number
1999091073
Lead Agency
San Bernardino Valley Municipal Water District
Document Title
Regional Water Facilities Master Plan
Document Type
NOP - Notice of Preparation of a Draft EIR
Received
Present Land Use
Current land uses within proposed improvement sites are rural residential, residential, commercial, industrial, agricultural, open space, habitat conservation, and public facilities.
Document Description
The proposed project is a Regional Water Facilities Master Plan. Proposed improvements would be constructed over an indefinite period of time and include 187,000 feet of pipelines ranging in size from 16 to 96 inches in diameter, twelve pump stations with capacities of 16 to 90 cfs. five reserviors ranging in size from 1 million to 100 million gallons, and a dewatering program to Lower high groundwater levels in the City of San Bernardino.

Contact Information

Name
G. Louis Fletcher
Agency Name
San Bernardino Valley Municipal Water District
Contact Types
Lead/Public Agency

Location

Cities
Colton, Highland, Loma Linda, Redlands, Rialto, San Bernardino, San Bernardino, Rialto, Colton, Loma Linda, Redlands, ..., Yucaipa
Counties
San Bernardino
State Highways
66, 38, 215 (30)
Railways
SPRR, BNSF
Airports
Redlands, Rialto Municipal
Waterways
Santa Ana River & Mill, Lytle, Cajon, Warm, City, and Plundge Creeks

Notice of Completion

State Review Period Start
State Review Period End
State Reviewing Agencies
California Department of Health Care Services (DHCS), California Department of Parks and Recreation, California Native American Heritage Commission (NAHC), California Regional Water Quality Control Board, Santa Ana Region 8 (RWQCB), California State Lands Commission (SLC), Department of Fish and Wildlife, Region 6, Office of Historic Preservation, Resources Agency, State Water Resources Control Board, Division of Water Quality, California Department of Transportation, District 8 (DOT), California Department of Conservation (DOC)
State Reviewing Agency Comments
California Department of Transportation, District 8 (DOT), California Department of Conservation (DOC)
Development Types
Water Facilities (pipelines, pump stations, and reserviors)
Local Actions
Master Plan
Project Issues
Aesthetics, Agriculture and Forestry Resources, Air Quality, Cultural Resources, Cumulative Effects, Drainage/Absorption, Flood Plain/Flooding, Geology/Soils, Growth Inducement, Hazards & Hazardous Materials, Hydrology/Water Quality, Land Use/Planning, Public Services, Transportation, Vegetation, Wetland/Riparian, Wildlife

Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above. You may also contact the OPR via email at state.clearinghouse@opr.ca.gov or via phone at (916) 445-0613.

Download CSV New Search Print